Standard Stock Fencing
£11.50 to £16.80 per metre
Treated stakes, two strands of barbed wire and galvanised netting, supplied and fitted. Ground, access, corners and old wire change the number.
Ask about a runStock Fencing And Strained Wire
Most failed stock fences were beaten before the netting went on. Corners too light, strainer assemblies too short, posts put where the ground was easy rather than where the pull needed them. Ed builds the ends first, then lets the line and the wire do their work.
Fence Types
Minimum Booked Job
Half a day or 40 metres of fencing, whichever is greater. Small repairs and re-straining start at £190 for the first half day, then £32 per hour plus materials.
Prices And Examples
Standard Stock Fencing
Treated stakes, two strands of barbed wire and galvanised netting, supplied and fitted. Ground, access, corners and old wire change the number.
Ask about a runPost And Rail
Three-rail pressure treated timber, supplied and fitted. Often used around yards, tracks and paddocks where impact and appearance both matter.
Send dimensionsRepair And Re-Strain
Then £32 per hour plus materials. Best for loose but salvageable fencing, storm movement, lifted staples and tired gateways.
Email photosOne half to one full day, usually £190 to £360 plus wire, staples or replacement stakes if needed.
Usually two to three days. Often £3,450 to £5,040 supplied and fitted, depending on access and old fence removal.
Usually four to six working days. Often £10,350 to £15,120 for standard supplied-and-fitted stock fencing before unusual gateways, rock or heavy clearance are added.
The Build
Walk the line, agree gateways, stock pressure, access and which old fence comes out.
Clear enough of the line to work safely without pretending a hedge is a straight edge.
Set strainers, turns and box assemblies before intermediate stakes go in.
Knock posts to the ground, not to a ruler, keeping the pull clean through rises and dips.
Pull netting, barbed wire or plain strands to working tension, then staple with movement allowed.
Walk the finished line, tie off loose ends and leave gates safe before the crew leaves.
Ground And Access
Rock slows driving and may need augering. Wet gateways take longer because posts need sound ground, not optimism. Steep banks change machinery access. Overgrown lines add clearing and old wire can be worse than bramble if it is buried in the hedge bottom.
Usual lead time is 3 to 5 weeks from March to October and 2 to 3 weeks in quieter winter spells. A 25% deposit books the slot for jobs over £1,500, with the balance due within 7 days of completion.
Two to three days if access is sensible and the old fence is not buried. More corners and wet ground add time.
Sometimes. Ed will use customer materials if they are suitable, complete and on site before the booked day.
Only when quoted. Loose wire and rotten posts are one thing. Hedge-grown netting is a different job.
Quote Notes
Photos of corners, gateways and the worst ground are more useful than polished descriptions. Send them to hello@therealwire.com.
Email Ed